More Information :
Civil works & electro-mechanical installations including well point dewatering system, excavation down to 5m below sea water level, dredging of sea water bed including under water rock breaking, constructing the intake chamber using precast and cast in-situ concrete, installation of diesel driven pumps 1000m3/hr @ 150m head, electrical equipments & material including main distribution panels, control panels cabling and cathodic protection .