More Information :
• Fabrication, welding & erection of carbon steel tank dia. 47m.
• R.C tank ring beam foundation.
• R.C underflow sump (9m deep).
• 4m x 4m x 60m Long tunnel, exit Shaft and miscellaneous R.C
foundation. Rubber lining of the wetted parts of the tank, tank
painting & insulation. Installation of thickener rake and its mechanism
including rake bridge and other related works.